Building Envelope Glossary
Plain-English meanings of the words in our reports, from flashing and WRB to ELD and AAMA 502. Written by Jackson Envelope Consulting for owners, boards and project teams.
A to Z
A
- AAMA 501.2
- A field check of storefront and curtain wall in which a calibrated nozzle sprays water at joints and seams while the inside is watched for leaks. Window and Storefront Water Testing →
- AAMA 502 / 503
- Field water tests for newly installed windows and doors (502) and storefront or curtain wall (503): water is sprayed on the outside while a chamber creates a pressure difference. Window and Storefront Water Testing →
- Air barrier
- The continuous layer of materials that stops air from moving through the envelope. Air leaks carry moisture and energy with them. Blower Door Testing →
B
- Ballasted roof
- A membrane held in place by stone or pavers rather than adhered; ballast must be moved to locate leaks. Electronic Leak Detection →
- Below-grade waterproofing
- Waterproofing at walls covered by backfill, typically at basements or subterranean parking structures.
- Blower door test
- A fan mounted in a doorway pressurizes or depressurizes the building to measure how much air leaks through the envelope. Blower Door Testing →
- Building envelope
- Everything that separates the inside of a building from the outside: roofs, walls, windows, doors, below-grade walls and the waterproofing between them. Also called the building enclosure.
C
- CapEx
- Capital expenditure: larger, planned spending to repair or replace building components, as opposed to routine maintenance. Property Condition Assessments →
- Chamber test
- A field water test where an air chamber on one side of a window creates a pressure difference while water is sprayed on the other side, like wind-driven rain. Window and Storefront Water Testing →
- Cladding
- Exterior wall covering such as brick masonry, lap or panel siding, stucco, EIFS, or metal panel.
- Coping cap
- The metal cap on top of perimeter parapet walls. If wind removes it, the membrane may peel back.
- Cover board
- A thin, rigid board under the membrane that protects the insulation and gives the membrane a firm surface.
- Curb
- The raised frame that rooftop equipment or a skylight sits on. The roof membrane turns up and is flashed against it.
- Curtain wall vs. window wall
- Curtain wall hangs outboard of the floor slabs (common in high-rise office); window wall sits between slabs and has more joints to maintain. Window and Storefront Water Testing →
D
- Delamination
- Layers separating from each other, such as a coating lifting off concrete or a membrane releasing from the board below it.
E
- Efflorescence
- White, salty staining on masonry; a leading indicator that water is trapped in the wall and the internal drainage system is not performing.
- EIFS
- Exterior Insulation and Finish System: foam insulation board covered with a thin reinforced finish that looks like stucco.
- Electronic leak detection (ELD)
- Testing that uses an electrical current across a roof or waterproofing membrane to find breaches, often before they leak inside. Low-voltage methods test a wet surface; high-voltage methods test a dry one. Electronic Leak Detection →
- EPDM (rubber)
- Usually black. Seams use adhesive tape which, while durable, is a wear item that eventually dries out and fails.
- Expansion joint
- An intentional gap that allows the building to move. Failed joints can leak vertically and affect multiple floors.
F
- Fastener plate
- The metal disc under a screw that holds insulation or membrane down to the roof deck.
- Fenestration
- Windows, doors, storefronts and skylights: the openings in a building's exterior walls and roof. Window and Storefront Water Testing →
- Flashing
- Formed metal or membrane pieces installed at edges, joints and openings to turn water outward so it drains instead of getting into the wall or roof.
I
- IGU (insulated glass unit)
- A double- or triple-pane glass unit within a window assembly.
- Infrared thermography
- A camera that shows surface temperature. Wet insulation holds heat differently than dry insulation, so likely wet areas stand out and are then confirmed by other testing. Infrared Thermography →
K
- Kick-out flashing
- A small angled flashing where a roof edge meets a wall. It sends water into the gutter instead of down behind the siding.
L
- Low-slope roof
- A roof that is nearly flat. It relies on a continuous membrane, rather than overlapping shingles, to keep water out.
M
- Mock-up
- A sample of a wall, window or roof assembly built and tested before full installation, so problems are fixed once instead of across the building. Construction QA Site Visits →
- Moisture survey
- Mapping where materials are wet with meters, infrared and test cuts, so repairs cover the real extent of damage. Infrared Thermography →
O
- Overburden
- Anything installed on top of a waterproofing membrane, such as pavers, soil, ballast or a green roof. It hides the membrane and makes leaks hard and costly to reach. Electronic Leak Detection →
P
- Parapet
- The short wall that extends above the roof at its edge.
- Penetration
- Anything that passes through the roof or wall, such as pipes, vents, conduit or equipment supports. Each one has to be flashed or sealed.
- Pitch pocket
- A sealant-filled reservoir around irregular roof penetrations. High-maintenance; sealant shrinks and cracks and typically needs attention every 3–5 years.
- Property condition assessment (PCA)
- A survey of a building's systems that rates their condition and estimates repair and replacement costs, often before a purchase or loan. Property Condition Assessments →
R
- Roof deck
- The structural surface under the roof insulation and membrane, such as wood, metal or concrete.
- Rough order-of-magnitude (ROM)
- An early cost range for planning, based on the observed conditions and typical pricing. It is not a contractor bid or a formal estimate. Property Condition Assessments →
S
- Sandwich slab
- A membrane buried beneath concrete or pavers. It cannot be reviewed without removing the surface, and leak repair costs are often many times the material cost. Electronic Leak Detection →
- Scuppers and drain bodies
- Roof drainage. Drains are set within the field of the roof and discharge through internal piping; scuppers are set at exterior walls and often drain to gutters.
- Seal failure
- Loss of the IGU seal allows moist air in and the glass fogs; the unit must be replaced.
- Sealant (caulk)
- The least expensive material on the building and the most common cause of failure. Quality sealant lasts roughly 7–15 years; lower-grade sealant can fail in under 5.
- Service life
- How long a system can be expected to keep performing, with normal maintenance, before it needs major repair or replacement. Property Condition Assessments →
- Sheathing
- The structural panels (usually plywood or OSB) fastened to the framing, behind the WRB and cladding.
- Sill, jamb and head
- The bottom, side, and top members of a window or door frame. Drainage typically occurs at the sill.
- Single-ply membrane
- A continuous, waterproof “skin” for the roof. TPO is the most common membrane used in low-slope roof construction.
- Spray rack
- A frame of nozzles that wets a window or wall evenly during a water test. Window and Storefront Water Testing →
- Storefront
- A framed glass wall system set between the floor and the structure above, common at ground-floor retail and lobbies. Window and Storefront Water Testing →
- Stucco
- A cement plaster finish applied over lath on an exterior wall.
- Submittal
- Product data and shop drawings the contractor sends for approval before installing. Reviewing envelope submittals catches mismatched or missing parts early. Building Envelope Design Review →
- Substrate
- The surface a material is installed on, such as the roof deck under a membrane or the sheathing under a coating.
T
- Test cut
- A small, planned opening in a roof or wall to look inside and confirm what testing showed. It is patched after. Forensic Water Intrusion Investigation →
- Through-wall flashing and weeps
- The wall’s internal drainage: flashing collects water behind the cladding and weeps drain it out. Missing or clogged weeps trap water in the wall.
- TPO / PVC (thermoplastic)
- Usually white. Seams are heat-welded, creating a monolithic sheet; reflective surfaces reduce cooling loads when kept clean.
- Traffic coating
- A protective coating on horizontal concrete that keeps water from reaching reinforcing steel. If neglected, rebar can corrode, expand, and crack the concrete.
- Transition
- Any place where one envelope material or system meets another, such as window to wall or wall to roof. Most leaks start at transitions. Construction QA Site Visits →
V
- Vapor retarder
- A material that slows water vapor moving through a wall or roof. Where it goes depends on the climate and the wall design.
W
- WRB (water-resistive barrier)
- The layer behind the cladding that keeps sheathing and interior walls dry while allowing vapor to escape. Improper installation or damage can lead to water-related damage. Construction QA Site Visits →